We have been commissioned to design, manufacture & install a 4000VRF desiccant AHU at a major american pharmaceutical research facility in Britain, alongside a 200VRF for a smaller seperate room.
The project has also included major lagged ductwork on site and has a water chiller attached, we anticipate the machine(s) to be finished within the next two weeks with commissioning by the end of June.
Here are two views of the completed AHU. The machine is now on top of a roof and ductwork connected, pipework for chilled water and gas supply is currently being fabricated. Mike is on site completing the electronics.
we have shot some 'work in progress' pictures...